Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory, Unpublished PhD Thesis, , Missouri University of Science and Technology.

  • Type: Thesis
  • Keywords: continuous improvement; decision making; disputes; modular construction; data mining; analytical hierarchy process; mathematical modelling; construction project; construction method
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2863224984
  • Abstract:
    Modularization is an approach that can potentially mitigate many of the currentconstruction industry’s challenges. Despite the documented advantages ofmodularization, the industry is still not able to capitalize on its full potential and benefits.The latter is due to the outdated decision-making models that may not reflect the multiplefactors involved in modular construction, the unique source of risks associated withmodular construction methods, need for continuous improvement, and complexcontractual requirements and disputes. As such, the goal is to promote the use ofmodularization in the construction industry by enhancing decision-making and proactiverisk management. The associated objectives are to: (1) determine decision-making factorsfor modular construction and provide future research directions; (2) understand the keyrisks affecting cost and schedule performance; (3) develop a benchmark to assess thelevel of risks associated with the use of modularization; (4) establish a risk-basedapproach to assess the cost and schedule benefits of modularization; (5) develop aframework for assessing the effective implementation of modularization; and (6)understand the causes of disputes in modularization. The research goal and objectiveswere achieved through multiple methodologies including surveys, graph theory,statistical and mathematical modelling, analytical hierarchy process, as well as clusteringand data mining. The outcome of this research contributes to the body of knowledge bydeveloping a comprehensive framework allowing for proactive management of modularrisks, assessment of effective implementation of modularization, as well as betterunderstanding of modular risks and causes of disputes in modular construction projects.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction, Unpublished PhD Thesis, , Missouri University of Science and Technology.

Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance, Unpublished PhD Thesis, , Missouri University of Science and Technology.

Gillis, W L, III (2013) Development of an integrative commissioning methodology for new-building construction, Unpublished PhD Thesis, , Missouri University of Science and Technology.

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics, Unpublished PhD Thesis, , Missouri University of Science and Technology.

Loduca, D P (2011) Exploratory study of barriers to use of Feigenbaum's quality cost strategy within design engineering firms, Unpublished PhD Thesis, , Missouri University of Science and Technology.

Szydlik, C C (2014) Identifying and overcoming the barriers to sustainable construction, Unpublished PhD Thesis, , Missouri University of Science and Technology.